Home / Solutions / Case Studies / Sports / DGI Huset Herning Leisure Centre, Denmark

DGI Huset Herning Leisure Centre, Denmark

  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • DGI Huset Herning Leisure Centre, Denmark
  • Lamp efficacy

    Lamp efficacy

    Ensuring the lamp efficiently converts electricity into light (lm/W).

  • Ballast classification

    Ballast classification

    Controlling the electricity supply to the lamp (Energy Efficiency Index).

  • Luminaire distribution

    Luminaire distribution

    Controlling light emission using optics which bend and shape the light to the correct location.

  • System efficacy

    System efficacy

    Combining optical and thermal control within the luminaire (luminaire lm/W).

  • Presence/absence detection

    Presence/absence detection

    Providing lighting only when it’s needed.

  • Daylight detection

    Daylight detection

    Reducing waste light during daylight hours.

  • Constant illuminance

    Constant illuminance

    Producing the correct lighting levels for the duration of the maintenance period.

  • Task-scene setting

    Task-scene setting

    Allowing the user to set scenes and adapt the lighting to different tasks.

  • Timed off

    Timed off

    Automatic cut-off to turn all lights off during unoccupied hours.

  • Task lighting

    Task lighting

    Lighting task areas with the correct amount of light.

  • Zoning of lighting

    Zoning of lighting

    Zoning lighting in accordance to occupancy patterns or window location.

  • Maintenance schedule

    Maintenance schedule

    Tailoring maintenance schedules in accordance to product age, performance and environment.

  • Waste light

    Waste light

    Eliminating waste light which does not hit the intended target.

  • Reflectance

    Reflectance

    Taking advantage of light which is reflected from the surface within the space.

  • Visible smart metering

    Visible smart metering

    Enabling results of actions to be quickly seen as increased or decreased energy use to encourage responsible energy consumption.

Thorn completes leisure facilities at DGI Huset

State of the art leisure centre lit with Cruz downlights, Troika and Contrast Mini Pinspot LED floodlights, to name but a few...

With more than 4,000 paying members, DGI Huset Herning Leisure Centre in Denmark includes a state-of-the-art wellness and fitness suite and an impressive swimming pool with a climbing wall, diving pool, lazy river and a 93m elliptical pool. The centre also offers a café and extensive conference facilities where it regularly hosts trade fairs.

With the swimming pool’s architecturally inspiring walls with various levels and different areas, creativity and aesthetic appeal were the key requirements for this project, along with the need to achieve a 500 lux light level.

Thorn supplied all of the lighting for the leisure and conference facilities, including Cruz HIT and TC-T downlights throughout, and the Troika ‘flat glass’ floodlight and Contrast Mini Pinspot LED floodlight in the swimming pool. The swimming pool features the ability to light in three different stages: to one-third, two-thirds or 100 per cent of the maximum light level.

Other products include Menlo3 with an opal diffuser (custom) for the conference facilities, Chalice MV decorative downlights for display areas and EquaLine Opal in the staircases.